Welcome to our Facmaster Factory!
mar 31, 2013 after receipt of sequential material and timely pre-assembly of boiler pressure parts planning for. erection of the pressure parts is to be taken up. for pressure part erection electrical. winches max puller chain pulley block etc are required may 25, 2021 the company has specialized in the handling, processing, and marketing of slag products for nearly 100 years, currently recycling more than million tons per year company-wide. with this mills production schedule, the slag must be processed continuously so it doesnt build up, the plant copper slag: research to recover value metals chemical analysis: fe, silica, 10% calcium oxide, cu, 0.3% mo, as well as Zn and precious metals, among others) now, testing slag as material for road construction. research and flowsheet proposals: target: recovery of cu, mo, fe.the lake charles facility is one of the worlds newest tio manufacturing plants and is the only plant site operated by louisiana pigment company, l.p. the plant was built by kronos at a cost of over $300 million, and came on-line in early 1992. the facility utilizes the chloride process and is