Welcome to our Facmaster Factory!
apr 25, 2011 prevailing winds act to smooth the new surface that is formed from the salt left behind during evaporation. since 1939, a potash recovery operation has been operating on land leased by the blm. the process works by collecting saltwater from the area and pumping it into evaporation pools to collect the minerals.feb 17, 2019 the ancient lake left behind a bounty of minerals embedded in a perfectly level hard pan extending off the silver island mountains south slope. the potash operator is to return as much salt aug 04, 2019 after drying the brine from the lakes, the sulphate of potash left is used as a premium fertiliser for fruits, vegetable and other plants that require this particular fertiliser. rapid dams area manager, said the prime purpose of developing the machine was to increase the capability of working on very soft terrain or in water up to 1.etres apr 29, 2011 this left-over salt and potash is then removed from the pond and transported to a processing facility where the potash is separated from the salt and refined for sale.